Fast KL has introduced that the audio system in LRT, MRT and Monorail trains is presently present process upgrading in phases. The transfer is consistent with the upcoming opening of the MRT Putrajaya Line Section 2, which is able to occur on March 16.
As such, commuters can ignore the bulletins associated to the brand new MRT Line. “In your info, the interchange stations to the MRT Putrajaya Line Section 2 are but to open,” Fast KL says.
Not lengthy now for the 38.7 km Section 2 from Kampung Batu alongside Jalan Ipoh to Putrajaya Sentral to totally open to the general public after some delays. This stretch consists of 15 elevated stations and 9 underground stations. Section 1 from Kwasa Damansara to Kampung Batu has been operating since June 2022.